Menu

Marahau Sea Kayaks

 

 

 

Project Details

This is the new office building for MSK and Marahau water taxis at the entrance of the Abel Tasman NP. The new office replaces an old 50's office which was too small and run down. The materials used are all low maintenance using plaster and Flashclad cladding. The public area is accessible for disabled people. The Office is situated on-site to allow for proper boat maneuvering around the building. Upstairs are 3 offices located with a balcony and sea views. The building includes a counter, shop, kitchen, offices, toilets and a boat waiting area.

 

Project Gallery

{jb_iconic_star}Click to view the full size image.{/jb_iconic_star}

  • MSK_Base_DSC7842
  • MSK_Base_DSC7887
  • MSK_Base_DSC7892
  • MSK_Base_DSC7932
  • MSK_Base_DSC7937
  • MSK_Base_DSC7952
  • MSK_Base_DSC7977
  • MSK_Base_DSC8007
  • MSK_Base_DSC8033
  • MSK_Base_DSC8038
  • MSK_Base_DSC8049
  • MSK_Base_DSC8108
  • MSK_Base_DSC8113
  • MSK_Base_DSC8144
  • MSK_Base_DSC8180
  • MSK_Base_DSC8187
  • MSK_Base_DSC8201
 

 

 

 

 

 

 

 

 

 

Read 246 times

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

close

Login